Powering Progress, Mile by Mile
Your energy project's success depends on massive, high-value components arriving on a precise schedule. Yakel Trucking provides specialized heavy haul and transportation logistics from wind turbine components to high-voltage power generation equipment.
Discuss your Energy ProjectLogistics for Every Energy Vertical
Specialized transportation for the future of power.
Renewable Energy
Precision transport of turbine blades, nacelles, towers, and large-scale solar arrays requiring specialized over-dimensional expertise.
Power Generation
Secure hauling for transformers, industrial generators, and high-voltage switchgear critical to grid infrastructure.
Energy Storage (BESS)
Compliant and secure delivery of large-format lithium-ion battery modules and integrated storage containers.
Specialized Capabilities for Energy Freight
Over-dimensional Permitting
Expert management of multi-state permits and regulatory compliance.
Remote Site Logistics
Advanced route planning for access to remote wind farms and rural substations.
Crane & Rigging Coordination
Seamless integration with onsite rigging teams for safe loading/offloading.
Expertise in Battery Transport (BESS)
As Indiana's power grid evolves, Yakel Trucking lead the way in Battery Energy Storage System (BESS) logistics. We handle the unique complexities of large-format lithium-ion components with meticulous care.
- Certified Hazmat Handling for lithium-ion storage technologies.
- Real-time temperature monitoring and shock-sensitive logistics.
- Coordinated last-mile delivery to secure storage sites.
Project Highlight
150-Ton Transformer Delivery: Indiana Substation Upgrade
The Challenge: Negotiating the transport of a 150-ton electrical transformer through populated areas with strict bridge constraints to reach a critical grid expansion site.
The Solution: Yakel deployed a specialized multi-axle trailer configuration, conducted a 50-mile route survey, and coordinated a 4-car police escort to ensure safe passage.
Result: On-time delivery, zero safety incidents, and immediate installation enabling a 200MW grid expansion.